Time-lapse documentation - construction logistics center Peggau
Long time lapse system
Period: 16 months
Drone flying
Architecture photography / photo documentary
Postproduction
- Stabilize, correct, and deflicker 6K footage
- various 4K final videos for TV/cinema and social media
Sager Group - New construction of a logistics hall in Styria
The SAGER GROUP built a new logistics center in the north of Graz. In times of increasing cost discipline, a growing number of companies are seizing every opportunity to avoid unnecessary truck tolls. With this in mind, among other things, the Sager Group built a new logistics center with rail connection in Peggau, which began operations at the end of 2017.
Full Service
technical and visual advice on installation locations, mounting and dismounting of cameras
Site documentation
6K Helios time-lapse camera for outdoor photography, drone flying and architectural photography
24/7 support and data provision
24/7 monitoring of the cameras by our staff, interface with availability of all data in full resolution
Postproduction
4K videos suitable for internet, social media, cinema, TV

By loading the video, you accept Vimeo's privacy policy.
Learn more